Project Structure

NEWTON project has a duration of 36 months and the work is divided into six work packages in order to enable efficient execution of the work required to meet the NEWTON objectives:

  • WP1 is devoted to management and technical/administrative coordination of the project.
  • WP2 is devoted for defining the technical specifications of the system and the architecture of the solution considering the different scenarios over which the system will be validated. 
  • WP3 is devoted to technical analysis, design and implementation of the different key building blocks which integrate the overall system.
  • WP4 is devoted to the integration of the prototypes, their calibration and their functional verification in the laboratory.
  • WP5 is devoted to the validation of the multi-sensor instruments in relevant environments.
  • WP6 is devoted to dissemination and exploitation of project results.